high-voltage CBs in live-tank, dead tank and GIS design.
Minimized rewiring tasks result in very short testing times. The integrated power supply guarantees a safe and independent operation. With HV live-tank and GIS CBs, timing measurements can be performed while both sides of the breaker stay grounded. With HV dead-tank and GIS CBs, integrated CTs can be demagnetized.
Key features
3-in-1 system: micro-ohmmeter, timing analyzer, and AC/DC power supply
One system for medium- or high-voltage circuit breakers with live-, dead-tank or GIS-design